Raised road surface and new retaining wall
This area of the B5106 dips below the river flood level, causing Trefriw to become isolated when the river floods. We will raise the height of the road by 1m as well as building the retaining wall up in the same style as the existing wall.
We will have to close the section of road to complete this work. There will be no access through this section of road at times – there will be a diversion signposted.
Road closure
Diagram of work